1 00:00:00,610 --> 00:00:02,610 Hello and welcome to the Cannon Air 2 00:00:02,610 --> 00:00:05,800 Force Fast public update on december 3 00:00:05,800 --> 00:00:09,160 14th 2020 . To my name is Christopher 4 00:00:09,160 --> 00:00:11,240 Gorky . I am the restoration project 5 00:00:11,240 --> 00:00:13,018 manager for the Air Force Civil 6 00:00:13,018 --> 00:00:15,830 Engineer Center located here at Cannon 7 00:00:15,830 --> 00:00:18,230 Air Force Base . And I am responsible 8 00:00:18,230 --> 00:00:20,940 for the P fast Investigation both on 9 00:00:20,940 --> 00:00:23,051 and off base here at Cannon Air Force 10 00:00:23,051 --> 00:00:25,750 Base . Today I'm gonna give you a brief 11 00:00:25,750 --> 00:00:28,120 overview of the status of our remedial 12 00:00:28,120 --> 00:00:30,500 investigation where we're currently at 13 00:00:30,510 --> 00:00:32,550 and our engineering evaluation cost 14 00:00:32,550 --> 00:00:35,380 analysis with pilot study and then talk 15 00:00:35,380 --> 00:00:38,070 about what we have going forward and 16 00:00:38,070 --> 00:00:40,237 review the additional information that 17 00:00:40,237 --> 00:00:43,100 you can access and our common acronyms . 18 00:00:44,720 --> 00:00:46,553 So today where we're at with our 19 00:00:46,553 --> 00:00:48,442 remedial investigation is we have 20 00:00:48,442 --> 00:00:50,331 completed a significant amount of 21 00:00:50,900 --> 00:00:54,070 Samples both on and off base collecting 22 00:00:54,070 --> 00:00:56,520 soil samples and ground water samples 23 00:00:56,530 --> 00:00:59,200 off base we're currently working on 24 00:00:59,200 --> 00:01:01,970 installing additional monitoring wells 25 00:01:01,980 --> 00:01:04,720 on base we have seven installed so far 26 00:01:04,780 --> 00:01:07,280 and we are working to get the arrest of 27 00:01:07,280 --> 00:01:10,660 the 13 installed here very soon within 28 00:01:10,660 --> 00:01:12,660 the next couple of months and we're 29 00:01:12,660 --> 00:01:14,900 currently planning the additional 15 30 00:01:14,910 --> 00:01:16,920 off base monitoring wells to be 31 00:01:16,920 --> 00:01:20,650 installed shortly thereafter . Now with 32 00:01:20,650 --> 00:01:22,910 this as we collect this data , we are 33 00:01:22,910 --> 00:01:24,920 already looking at how to fully 34 00:01:24,920 --> 00:01:27,310 delineate so what that nature and 35 00:01:27,310 --> 00:01:31,000 extent how wide how far and that the 36 00:01:31,000 --> 00:01:33,210 impacts are both on and off base . So 37 00:01:33,210 --> 00:01:35,390 as we are sampling we will continue to 38 00:01:35,390 --> 00:01:37,950 do step out samples until we have fully 39 00:01:38,140 --> 00:01:40,520 determine what that impact looks like , 40 00:01:40,530 --> 00:01:44,280 both on and off base . Now with that 41 00:01:44,280 --> 00:01:47,000 the map on the left is showing the 42 00:01:47,000 --> 00:01:49,111 potential locations where we're gonna 43 00:01:49,111 --> 00:01:51,320 put off base monitoring wells . And we 44 00:01:51,320 --> 00:01:54,070 have decided this based on the map on 45 00:01:54,070 --> 00:01:56,680 the right , which shows a generalized 46 00:01:56,690 --> 00:01:59,550 location of the off base impacts 47 00:01:59,640 --> 00:02:01,418 determined from the groundwater 48 00:02:01,418 --> 00:02:03,196 monitoring samples that we have 49 00:02:03,196 --> 00:02:06,200 collected to date so far . And with 50 00:02:06,200 --> 00:02:08,144 this , you can see the groundwater 51 00:02:08,144 --> 00:02:10,500 groundwater contour map that we have 52 00:02:10,500 --> 00:02:12,960 overlaid on it and it shows where that 53 00:02:12,960 --> 00:02:15,800 groundwater flow is and specifically 54 00:02:15,800 --> 00:02:18,240 that plume seems to be migrating 55 00:02:18,240 --> 00:02:20,351 through the paleo channels that we've 56 00:02:20,351 --> 00:02:22,518 discussed in other meetings where it's 57 00:02:22,518 --> 00:02:25,200 coming off that southeast corner and 58 00:02:25,200 --> 00:02:27,770 that pink reddish area is the 59 00:02:27,770 --> 00:02:29,670 concentrations that are above the 60 00:02:29,670 --> 00:02:32,270 regional screening levels . And so as 61 00:02:32,270 --> 00:02:34,440 you look to the left on that picture , 62 00:02:34,440 --> 00:02:36,273 you'll see that we are trying to 63 00:02:36,273 --> 00:02:38,051 bracket that area in with these 64 00:02:38,051 --> 00:02:40,180 monitoring wells to make sure that we 65 00:02:40,180 --> 00:02:43,040 have the outer boundaries of it . And 66 00:02:43,050 --> 00:02:45,770 so that way we know where that impact 67 00:02:45,770 --> 00:02:49,210 is with additional monitoring wells 68 00:02:49,220 --> 00:02:51,430 inside it . So that way we can monitor 69 00:02:51,440 --> 00:02:54,760 that movement of the plume and with 70 00:02:54,760 --> 00:02:57,180 that as we collect this data that will 71 00:02:57,180 --> 00:02:59,347 help us in the long run determine what 72 00:02:59,347 --> 00:03:02,210 that complete picture is and how we 73 00:03:02,210 --> 00:03:04,570 actually will address it and clean up 74 00:03:04,580 --> 00:03:08,150 those impacts . Now with this , it has 75 00:03:08,150 --> 00:03:10,490 also given us that information to where 76 00:03:10,490 --> 00:03:13,330 we have for our Eka and a pilot study 77 00:03:13,340 --> 00:03:16,160 and we have that focus area on that 78 00:03:16,160 --> 00:03:18,930 southeast corner based on the data that 79 00:03:18,930 --> 00:03:21,760 we've collected , we know that plume is 80 00:03:21,760 --> 00:03:24,320 migrating off of there and so that is 81 00:03:24,320 --> 00:03:26,840 why we have targeted that area . We'll 82 00:03:26,840 --> 00:03:29,030 have the four extraction wells located 83 00:03:29,030 --> 00:03:32,280 in that area and then the yellow 84 00:03:32,710 --> 00:03:35,140 extra monitoring wells that we have are 85 00:03:35,140 --> 00:03:38,510 going to be there . So that way as we 86 00:03:38,520 --> 00:03:40,570 operate the pump and treat system , 87 00:03:40,580 --> 00:03:42,747 we'll be able to look at that data and 88 00:03:42,747 --> 00:03:44,800 ensure that we have full capture of 89 00:03:44,800 --> 00:03:48,210 that impacted area coming off base and 90 00:03:48,210 --> 00:03:50,920 if needed we can turn those also into 91 00:03:50,930 --> 00:03:54,100 extraction wells and then upgrading of 92 00:03:54,100 --> 00:03:56,156 it . The triangles that you see near 93 00:03:56,156 --> 00:03:58,378 the treatment plant will be the general 94 00:03:58,378 --> 00:04:00,489 location of where the injection wells 95 00:04:00,489 --> 00:04:02,433 are . So we will pull out from the 96 00:04:02,433 --> 00:04:04,750 extraction wells , it will be sent up 97 00:04:04,760 --> 00:04:08,130 to the treatment plant then treated and 98 00:04:08,130 --> 00:04:10,520 then re injected back into the aquifer . 99 00:04:10,530 --> 00:04:12,419 So that way we'll have a zero net 100 00:04:12,419 --> 00:04:14,650 impact on the aquifers water 101 00:04:16,260 --> 00:04:18,427 where we're at to date on that . We're 102 00:04:18,427 --> 00:04:20,280 currently in the design progress 103 00:04:21,110 --> 00:04:24,020 portion of it working to finalize that 104 00:04:24,020 --> 00:04:26,280 design right now , we're looking that 105 00:04:26,290 --> 00:04:29,570 in january of 2023 will be sending that 106 00:04:29,580 --> 00:04:32,660 package to N M E D and E . P A . For a 107 00:04:32,660 --> 00:04:35,550 30 day comment period . And at that 108 00:04:35,560 --> 00:04:38,560 point we will then finalize 109 00:04:38,570 --> 00:04:42,190 the design , we will then start 110 00:04:42,190 --> 00:04:45,970 construction in March of 2023 And then 111 00:04:45,980 --> 00:04:49,090 operation will fully begin in December 112 00:04:49,100 --> 00:04:52,410 of 2023 and the final portion of the 113 00:04:52,410 --> 00:04:55,800 Ika will then be completed in June of 114 00:04:55,800 --> 00:04:59,540 2024 . Now with that , the operation of 115 00:04:59,540 --> 00:05:01,762 the pump and treat system will continue 116 00:05:01,762 --> 00:05:04,780 on and those outputs from that ECC will 117 00:05:04,780 --> 00:05:08,500 then determine if we need to upscale 118 00:05:08,510 --> 00:05:10,510 that pump and treat system to fully 119 00:05:10,510 --> 00:05:13,430 ensure that we are in fact capturing 120 00:05:13,430 --> 00:05:17,000 all of that plume coming off base . Now 121 00:05:17,000 --> 00:05:18,889 with that throughout the remedial 122 00:05:18,889 --> 00:05:21,090 investigation and our engineering 123 00:05:21,090 --> 00:05:23,210 evaluation , cost analysis and the 124 00:05:23,210 --> 00:05:25,800 pilot study , we are continuing to look 125 00:05:25,800 --> 00:05:28,350 at the data and determine any other 126 00:05:28,360 --> 00:05:31,400 options for interim remedial actions 127 00:05:31,400 --> 00:05:33,610 that can be taken prior to the end of 128 00:05:33,610 --> 00:05:35,780 our investigation . So that is a 129 00:05:35,780 --> 00:05:38,420 continuous continuous process that we 130 00:05:38,420 --> 00:05:42,400 will do throughout this process . So 131 00:05:42,400 --> 00:05:45,000 going forward again with our econ pilot 132 00:05:45,000 --> 00:05:47,056 study were in that design phase . So 133 00:05:47,056 --> 00:05:49,750 we're pushing hard to finalize that and 134 00:05:49,750 --> 00:05:52,330 get a final work plan and that way we 135 00:05:52,330 --> 00:05:54,497 can start construction because once we 136 00:05:54,497 --> 00:05:56,552 can get that construction going then 137 00:05:56,552 --> 00:05:58,719 we're gonna be working towards getting 138 00:05:58,719 --> 00:06:00,441 plant operational and actually 139 00:06:00,441 --> 00:06:02,560 affecting clean up in there and 140 00:06:02,570 --> 00:06:05,060 providing extremely good data for our 141 00:06:05,070 --> 00:06:07,230 EKA that will ultimately give us what 142 00:06:07,230 --> 00:06:09,960 the interim remedial action is that we 143 00:06:09,960 --> 00:06:13,620 can upscale that pilot study too . With 144 00:06:13,620 --> 00:06:15,787 our remedial investigation we're gonna 145 00:06:15,787 --> 00:06:17,830 continue fieldwork and as I said , 146 00:06:17,830 --> 00:06:20,750 we'll step out as needed to make sure 147 00:06:20,750 --> 00:06:23,600 that we fully delineate what that plume 148 00:06:23,610 --> 00:06:25,600 is . So that way at the end we can 149 00:06:25,600 --> 00:06:28,760 address and clean up all those impacts . 150 00:06:28,770 --> 00:06:30,881 And right now in the short term we're 151 00:06:30,881 --> 00:06:32,826 going to continue to install those 152 00:06:32,826 --> 00:06:34,937 monitoring wells both on and off base 153 00:06:35,970 --> 00:06:38,180 Right now . The next public quarterly 154 00:06:38,190 --> 00:06:40,660 update is tentatively planned for 15 155 00:06:40,660 --> 00:06:43,430 March of 2023 . And we are currently 156 00:06:43,430 --> 00:06:45,486 determining our path forward for the 157 00:06:45,486 --> 00:06:47,652 way that we will handle these meetings 158 00:06:47,652 --> 00:06:49,541 right now . This one is obviously 159 00:06:49,541 --> 00:06:51,763 prerecorded but we are looking for more 160 00:06:51,763 --> 00:06:54,650 secure virtual platforms to open that 161 00:06:54,660 --> 00:06:58,050 forum back up to have uh live in person 162 00:06:58,060 --> 00:07:01,330 uh conversations to have the community 163 00:07:01,330 --> 00:07:04,400 involved and have that open line of 164 00:07:04,400 --> 00:07:06,750 communication with everyone . 165 00:07:08,120 --> 00:07:11,210 If you have any questions , please send 166 00:07:11,220 --> 00:07:13,940 any questions , comments or concerns to 167 00:07:13,940 --> 00:07:17,340 the address listed above . And we will 168 00:07:17,340 --> 00:07:20,080 get back to you with those now for 169 00:07:20,080 --> 00:07:22,080 additional information if you would 170 00:07:22,080 --> 00:07:24,247 like to you can go to this link to the 171 00:07:24,247 --> 00:07:27,340 administrative record and if you click 172 00:07:27,350 --> 00:07:30,530 on the link or type in the link , then 173 00:07:30,540 --> 00:07:34,200 select continue to site . You'll on the 174 00:07:34,200 --> 00:07:37,230 installation link link , select Cannon 175 00:07:37,240 --> 00:07:40,690 Air Force Base . And you will be able 176 00:07:40,690 --> 00:07:43,670 to select in the A . R . Number box 177 00:07:43,670 --> 00:07:45,892 that is circled in red . You can put in 178 00:07:45,892 --> 00:07:48,830 any of these are numbers and then hit 179 00:07:48,850 --> 00:07:51,017 the search button and it will bring up 180 00:07:51,017 --> 00:07:52,961 these documents . That way you can 181 00:07:52,961 --> 00:07:54,794 download and review them at your 182 00:07:54,794 --> 00:07:57,920 leisure . Also for additional 183 00:07:57,920 --> 00:08:00,410 information , we have the Canon P . A 184 00:08:00,410 --> 00:08:03,750 website for the environmental section 185 00:08:03,760 --> 00:08:06,690 and we have all of the virtual public 186 00:08:06,690 --> 00:08:08,690 meetings have been recorded and are 187 00:08:08,690 --> 00:08:11,030 available here . There's also 188 00:08:11,040 --> 00:08:13,640 additional preface information 189 00:08:13,640 --> 00:08:16,390 documents that are available here , and 190 00:08:16,390 --> 00:08:18,820 also the instructions on how to reach 191 00:08:18,820 --> 00:08:21,890 the administrative record are located 192 00:08:21,890 --> 00:08:25,800 at this website . And then , 193 00:08:25,810 --> 00:08:27,699 as always , we provide our common 194 00:08:27,699 --> 00:08:30,520 acronyms on these next two slides that 195 00:08:30,520 --> 00:08:31,853 are available for you . 196 00:08:34,770 --> 00:08:36,937 These slides are also available at the 197 00:08:36,937 --> 00:08:39,200 Cannon Air Force Base Environmental 198 00:08:39,200 --> 00:08:42,990 website . Thank you for watching this 199 00:08:43,040 --> 00:08:44,910 public update for the Fast 200 00:08:44,910 --> 00:08:47,077 investigation here at Cannon Air Force 201 00:08:47,077 --> 00:08:49,680 Base and look forward to having you at 202 00:08:49,680 --> 00:08:50,470 our next one .